Skip to main content

Train preparation

Process for ensuring that a train is in a fit condition to enter service, that the train equipment is correctly deployed and the train composition matches the train's designated route(s). It includes the coupling or decoupling of vehicles, connecting or disconnecting of pipes, services, cabling and the indication of a rear end signal. Train preparation also includes brake configuration setting and the inspections, tests, and checks before departure. Note: The movement to get a vehicle in or out of the train composition is a shunting movement.
Last updated document

Commission Implementing Regulation (EU) 2025/458 of 10 March 2025

Document
TSI
Context
Operation
Origin document

Commission Implementing Regulation (EU) 2019/773 of 16 May 2019 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union and repealing Decision 2012/757/EU

Release