Skip to main content

Production phase

The production phase is the period during which rolling stock subsystems may be placed on the market on the basis of an EC declaration of verification referring to a valid EC type or design examination certificate.
Last updated document

Commission Implementing Regulation (EU) 2023/1694 of 10 August 2023

Document
TSI
Context
Freight
Origin document

Commission Regulation (EU) No 321/2013 of 13 March 2013 concerning the technical specification for interoperability relating to the subsystem ‘rolling stock — freight wagons’ of the rail system in the European Union and repealing Decision 2006/861/EC

Release