Draft TimeTable / offer (DTT)

Timetable to be prepared by the by IMs/C-OSS no later than four months after the deadline for receipt of requests for capacity to be incorporated into the working timetable. The aim of the draft offer is to present to the applicants a possible timetable according to which their train can conduct a journey. Infrastructure managers should do their utmost to comply in the draft offer with the initial path request operation concept.