Skip to main content

Direction of measurement of trackside HABD

Specific for the French Italian and Swed­ ish networks. Applicable if trackside HABD is not TSI compliant, direction of measurement of trackside Hot Axle Box Detector. If the direction of measurement is: — the same as the direction defined by the start and end of the SoL: (N) — the opposite to the direction defined by the start and end of the SoL: (O) — both directions: (B)
Last updated document

Commission Implementing Regulation (EU) 2023/1694 of 10 August 2023

Document
Regulation
Context
Infrastructure
Origin document

Commission Implementing Regulation (EU) 2019/777 of 16 May 2019 on the common specifications for the register of railway infrastructure and repealing Implementing Decision 2014/880/EU

Release