Skip to main content

Design phase for CCS On-Board Subsystem

It is the period starting once a notified body, which is responsible for EC verification, is contracted by the applicant and ending when the EC type or design examination certificate is issued. A design phase covers the CCS subsystem integrated in a vehicle type and one or several type variant(s) and type version(s). For all type variant(s) and type version(s), the design phase is considered as starting at the same time as for the main type.
Document
Regulation
Context
Control-Command and Signalling
Origin document

Commission Implementing Regulation (EU) 2023/1695 of 10 August 2023 on the technical specification for interoperability relating to the control-command and signalling subsystems of the rail system in the European Union and repealing Regulation (EU) 2016/919

Release