From Certification to Authorisation, challenges and issues

Day #1 - Workshop #7

The journey from manufacturing to real-life operation for both vehicles and infrastructure goes via several intermediate steps which can be challenging. In this workshop we will be sharing experience about:

  • CCS TSI 2023 transition regime and other changes impacting the certification and authorisation processes;
  • Impact caused by selection of modules in the certification process;
  • Challenges: if manufacturers’ deliveries are delayed but the date for putting into service is already fixed and cannot be moved, with the NoBo in between – how do we manage such challenging situations?
  • Small changes and retro-fitment of already certified vehicles (what to do, which TSI to use – discussion of some “use cases”);
  • How to optimise certification outcomes within the authorisation process (from submission of an application to obtaining APIS), from ISVs for overall design up to final type-6 certificates;
  • Specific case: certification deliveries in case of stepwise authorisation process, e.g. AfT (Authorisation for Testing) and then APIS (Authorisation for placing in service) - (for AfT, ISVs for overall design and production stage supposed to be sufficient, certificates - including testing - necessary for APIS)
This page was created in the context of an event organised by the European Union Agency for Railways. The information was provided at the time of the event and may not reflect the person’s current role or activities. Last updated on 26 February 2024, this content may no longer be fully up to date, and the Agency does not guarantee its accuracy or completeness.