Skip to main content

Production phase for CCS On-Board Subsystem

It is the period during which the CCS on-board subsystem may be placed on the market on the basis of an EC declaration of verification referring to a valid EC type or design examination certificate. `Any vehicle in production phase shall meet the CCS on-board subsystem requirements after the deadline stated in the column production phase. This is independent of whether the associated vehicle type design phase is completed before or after the CCS TSI entered into force. As such, an implementation requirement within the production phase should be taken into account in the overall planning of a vehicle project.’
Last updated document

REC ERA1218-2 Annex 1 - Amendments to Annexes I and II

Document
Regulation
Context
Control-Command and Signalling
Origin document

Commission Implementing Regulation (EU) 2023/1695 of 10 August 2023 on the technical specification for interoperability relating to the control-command and signalling subsystems of the rail system in the European Union and repealing Regulation (EU) 2016/919

Release